Start with heat load, not a fixed saving percentage.

Industrial thermal oil heaters and mold temperature control systems can use different heat sources: electricity, natural gas, LNG or diesel. The lower-cost option depends on the required heat load, local tariff, operating hours, heating efficiency assumption, heat loss, exhaust arrangement and maintenance condition.

This page keeps the energy discussion conditional. It does not claim a universal 30%, 50% or 60% saving. Use the formulas below to make the comparison transparent, then send the result with process data for engineering review.

Required project inputs

Useful heat loadRequired heating capacity in kcal/h or kW, including start-up and process losses where they are known.
Target temperatureOil outlet temperature, return temperature and acceptable heat-up time for molds, hot presses, reactors or rollers.
Energy pricesLocal electricity price per kWh, natural-gas price per m³, LNG or diesel price per local unit.
Operating scheduleOperating hours per day, working days per year, batch or continuous production rhythm.
System conditionPipe insulation, thermal oil condition, exhaust route, burner maintenance, voltage capacity and available gas or fuel infrastructure.

Transparent calculation formulas

Default heat values should be replaced with local fuel data when available. Efficiency assumptions should be confirmed by the selected configuration and site condition.

Swipe horizontally to view all specifications.

Heating optionHourly energy use formulaAnnual cost formulaImportant condition
Natural gas thermal oil heaterGas m³/h = heat load ÷ gas heat value ÷ gas system efficiencyGas m³/h × gas price × hours/day × days/yearGas pressure, burner setup, exhaust temperature and heat recovery affect actual use.
Diesel thermal oil heaterDiesel unit/h = heat load ÷ diesel heat value ÷ diesel system efficiencyDiesel unit/h × diesel price × hours/day × days/yearUse the local diesel heat value and unit price; storage and maintenance cost should be included.
Electric thermal oil heaterkWh/h = heat load ÷ 860 ÷ electric system efficiencykWh/h × electricity price × hours/day × days/yearVoltage capacity, demand charge and control strategy can change the real operating cost.

Separate operating energy from total project cost

The calculator compares variable energy use. A procurement decision should also record costs and risks that sit outside the hourly fuel or electricity formula.

Utility tariff structureAdd electric demand charges, time-of-use rates, fixed service fees, gas minimum-use terms and local taxes where they apply.
Site infrastructureCompare gas train, piping, ventilation and exhaust with transformer, switchgear, cable and plant electrical-capacity upgrades.
Maintenance and consumablesRecord burner inspection, filters, electrodes or nozzles, exhaust service, electrical switching components, pump service and thermal oil condition.
Downtime and production riskInclude utility reliability, planned service time, spare-parts availability, restart time and the production cost of an unplanned stop.

Example comparison structure

For a 200,000 kcal/h class thermal oil heating duty, the website calculator can compare annual cost after you enter local tariffs and operating hours. The output should be treated as an estimate for discussion, not a guaranteed saving.

Swipe horizontally to view all specifications.

InputExample valueWhy it matters
Heat load200,000 kcal/hDefines the useful heat duty before fuel or electricity is compared.
Natural gas heat value8,500 kcal/m³ defaultReplace with the local gas supplier value where available.
System efficiencyEditable assumptionUse the value agreed for the selected configuration and site condition.
Operating scheduleHours/day × days/yearAnnual cost difference grows only when the equipment runs enough hours.
ROI checkAdditional investment ÷ annual operating cost differencePayback is meaningful only when the cost difference is positive and repeatable.

When the estimate is decision-ready

Use the result as an early comparison until the heat duty, tariff and operating schedule are supported by project documentation. For a retrofit, prepare recent utility bills, measured production hours, batch or line output, start-up and holding periods, supply and return temperatures, maintenance history and the reason for replacement. For a new line, keep uncertain values visible as assumptions and compare more than one duty or tariff scenario.

Do not calculate payback by comparing different heat duties, by using heater nameplate power as useful heat output, or by applying a headline tariff that excludes demand and fixed charges. A payback period should state the additional investment, annual cost difference, included cost items and sensitivity to the main assumptions.

How to discuss ROI with Yigao

  • Compare the same heat duty.Gas, diesel and electric systems must be compared against the same useful heat load, target temperature and operating schedule.
  • Include site infrastructure.Gas piping, exhaust, diesel storage, voltage capacity, transformer load and safety requirements can change the practical choice.
  • Separate energy cost from equipment selection.A lower fuel cost does not automatically mean a better project if the site utility, maintenance or process control condition is unsuitable.
  • Use measured data when available.Existing production energy bills, machine heat-up time and oil-temperature records make the estimate more reliable.

Recommended products

Thermal oil equipment for cost comparison.

Direct inquiry

Send heat load, local tariffs and operating hours for a conditional cost comparison.

Submit process data through the website form or contact the sales and engineering team by WhatsApp or phone.

Project-fit review

Start with the process data you have now.

You do not need a finished equipment specification. Send the known duty, present operating issue or available drawing, and Yigao can identify which inputs are still needed before a model and quotation are confirmed.

A useful first brief can include

  • Application or material being heated
  • Target temperature or current problem
  • Heating medium, airflow or oil circuit
  • Available fuel, voltage and power capacity
  • Equipment size, photo, nameplate or drawing
  • Destination country and required quantity
Final specifications and performance depend on the selected configuration, operating conditions and project requirements.